Hidden defects in a home you bought in Spain: deadline and how to claim

· By the Consultor y Abogado teamChat on WhatsApp

What hidden defects in a home are

A hidden defect (vicio oculto) in a home is a flaw that was already there when you bought it, could not be seen and is serious enough that, had you known, you would not have bought it or would have paid less. This guide is for anyone buying a home in Madrid, resale or new: what the law allows you to claim, within what deadline and what to check before signing so you never need to.

The definition is in article 1484 of the Civil Code: the seller is liable for hidden defects that make the home unfit for its use, or reduce that use so much that the buyer would not have bought it or would have paid less. They are not liable for obvious or visible defects, nor for hidden ones if the buyer is an expert who, by profession, should easily have spotted them. And they are liable even if they did not know about them (art. 1485 of the Civil Code).

If you are about to buy, also read what to check when buying a home.

Claiming against the seller for defects: what you can ask for

Undo the purchase
You can withdraw from the contract and be reimbursed the costs you paid (art. 1486 of the Civil Code).
A price reduction
Or keep the home with a proportional reduction in price, as assessed by experts (art. 1486 of the Civil Code).
Damages if they knew
If the seller knew of the defect and did not tell you, you are also compensated for damages if you choose to undo the purchase (art. 1486 of the Civil Code).
The «sold as seen» clause
Agreeing that the seller is not liable for hidden defects only releases them if they genuinely did not know (art. 1485 of the Civil Code). If they knew, that clause does not protect them.

Deadline for claiming hidden defects in a home

Article 1490 of the Civil Code says these actions «shall be extinguished six months after delivery of the thing sold». Six months from delivery, not from when the defect appears.

Whether the six months of article 1490 is a strict time limit (caducidad) or a limitation period (prescripción) is something case law has not settled in a single way, and we do not take sides here. The difference matters: a limitation period is interrupted, among other ways, by an out-of-court claim by the creditor (art. 1973 of the Civil Code), whereas a strict time limit is not. Since the courts do not interpret it consistently, the prudent course is to treat the article 1490 deadline as a limit that cannot be stretched.

If the defect is so serious that the home is useless for the purpose it was bought for, it has sometimes been claimed as breach of contract (arts. 1101 and 1124 of the Civil Code), with the five-year period that article 1964.2 of the Civil Code gives personal actions without a special deadline. Whether a case fits that route depends on how the court assesses it.

Hidden defects in new builds

If the home is new, the Building Act (Ley 38/1999, de Ordenación de la Edificación, LOE) also applies. Its article 17.1 makes those involved in the construction liable for material damage appearing in the building within these periods: ten years, for defects in structural elements that directly compromise the building's strength and stability; three years, for defects in building elements or installations that fail habitability requirements; and one year, the builder, for workmanship defects in finishes.

The article 17.1 LOE periods run from acceptance of the works, not from your purchase, and set the window within which the damage must appear. Once it appears, the action is time-barred after two years (art. 18.1 LOE). The developer is jointly liable with the other agents towards buyers (art. 17.3 LOE), without prejudice to the seller's liability under articles 1484 et seq. of the Civil Code (art. 17.9 LOE).

How to avoid hidden defects in a resale flat

Visit with a professional
An architect or building surveyor spots covered-up damp, painted-over cracks or old installations. What is seen before signing is no longer hidden: it is negotiated then.
Ask in writing
Ask the seller to declare whether they know of damp, leaks or structural problems. If they knew and kept quiet, the compensation in article 1486 of the Civil Code may apply.
Read the association's minutes
The latest meeting minutes reveal the building's problems: leaks, pending works, special levies.
Check the hidden defects clause
If the draft says it is sold «as seen», negotiate it before signing the arras, not at the notary.
Get a review before you sign
In a purchase we review the land registry extract, the charges, the planning status, pending levies and the state of the contract, and tell you what you are really buying.

How to request a review

Call us or message us on WhatsApp at +34 668 559 739.

Questions about hidden defects in a home

How long do I have to claim hidden defects in a home?

Six months from delivery, under article 1490 of the Civil Code. Whether it is a strict time limit or a limitation period is interpreted differently by the courts, so it is best not to cut it close.

Is the seller liable if they knew nothing about the defect?

Yes: article 1485 of the Civil Code makes them liable even if unaware, unless otherwise agreed and they genuinely did not know. If they knew and kept quiet, they must also pay damages if you choose to undo the purchase (art. 1486).

Is damp that was visible at the viewing a hidden defect?

No. Article 1484 of the Civil Code excludes obvious or visible defects. What you see before signing must be negotiated then.